Water supply and drainage
Tab Water and heating, buttons and . Here you place outlets for plumbing fixtures, run cold and hot water and drainage pipes, check them by calculation according to SP 30, and compile the album. Above the and tiles there is a list of steps Auto layout · Floor N: 1 Outlets, 2 Pipes with a choice of layout, 3 Calculation and checks. A completed step has a green check mark and Redo, the current one is highlighted and carries the main button, and the following ones are marked with a number in a circle.
Tasks in this topic
- How to place outlets for fixtures and appliances
WhereWater and heating tab → or → step 1 Outlets above the tiles, Place button (when all fixtures have outlets, Redo).
- How to place an outlet, manifold or valve manually
Where → , ; → , .
- How to run a pipe
Where → (cold В1, hot Т3, circulation Т4) or → (К1).
- How to build pipes automatically
Wherestep 2 Pipes above the and tiles, the Build button; in the Calculation and checks window, the Build pipes button above the remarks.
- How to check with a calculation
Wherestep 3 Calculation and checks, above the tiles and (the number of issues is next to them); the window Water and drainage · calculation per SP 30 opens. On the left are the input data, on the right the totals as tiles, issues, flows by floor, head, stacks, pipes and the specification.
- How to assemble the VK set: water and drainage
WhereDrawings → Export → VK set: water and drainage or the Album button in the Calculation and checks window. Heating and ventilation go in a separate HVAC set (Heating, underfloor heating, air conditioning, ventilation): per GOST R 21.101-2026, cl. 4.2.4, each main set has its own designation with a mark and its own numbering, and the standard does not allow combining VK and OV. The stamp reads project-VK.